The construction technology of HT access floor (1)
1. The requirements toward field
① The laying of HT access floor should be arranged after the completeness of indoor civil and decoration construction.
② The ground needs to be kept smooth, dry and clean without sundries and dust before the laying of HT access floor.
③ Before the application of HT access floor, making sure that the pipeline of cable, circuit, water, air etc. and air
conditioner system have been accomplished.
④ Before the application of HT access floor, guaranteeing that the base of large heavy equipment has been
completely fixed.
⑤ The construction site of laying HT access floor should be equipped with 220V/50HZ power supply and water supply.