The construction technology of HT access floor (1)
  2015/08/17| View:1255

1.  The requirements toward field

① The laying of HT access floor should be arranged after the completeness of indoor civil and decoration construction.

② The ground needs to be kept smooth, dry and clean without sundries and dust before the laying of HT access floor.

③ Before the application of HT access floor, making sure that the pipeline of cable, circuit, water, air etc. and air 

conditioner system have been accomplished.

④ Before the application of HT access floor, guaranteeing that the base of large heavy equipment has been 

completely fixed. 

⑤ The construction site of laying HT access floor should be equipped with 220V/50HZ power supply and water supply. 